The Innovative Quick Release System with Hinge Technology Enables a Quick and Simple Assembly of the Placing Boom
What sets this stationary boom apart, from others in its category, is its broad and diverse applications. It functions as effectively in the construction of power stations, caverns, liquid gas tanks and bridges as well as high-rise building construction sites. The fact that is lightweight makes it easy to transport across sites. These stationary booms are ideally suited for integration in climbing formwork, the autonomous through-climbing of floors, as well as free-standing installations. You are guaranteed secure operation of the boom thanks to the compact slewing head without stationary parts. The use of low-maintenance standard components keeps service costs down.
It is suitable for the RS 850 tubular column system from Putzmeister.
All data provided is based on experience and depends on the material used. Specifications subject to change without prior notice, no responsibility is taken for the correctness of this information. Other data can be obtained on request.
Trankärrsgatan 20 425 37 Hisings Kärra Tel: +46 (0)31 49 80 90 Den här e-postadressen skyddas mot spambots. Du måste tillåta JavaScript för att se den.
ÖPPETTIDER
Vi har öppet Måndag till Fredag 07.00 - 16.00 (Lunchstängt 11.30-12.15) Lör-Sön: Stängt
AKUTA PROBLEM
Vid akuta problem eller rådgivning nås vi på telefon 031-49 80 90